Gosh, Rick, I thought everyone looking at Full-Time 4WD Nitros understood that it would not be available until July 10th. Or at least that is the date still floating around in fleet web sites. That is why a lot of us went ahead and ordered the part-time 4WD on or immediately after Jan. 8 when the door opened for MyGIG. Like you, I really wanted the full-time transfer case. But I didn't want to wait 6 months until the factory started churning out new Liberty's in competition with the Nitro. I really suspect that this is an internal Chrysler thing where Jeep didn't want Dodge to produce a full-time 4WD Nitro until Jeep could produce a like Liberty model, even though I suspect the Liberty model will have a low range included.
You can monitor this website for future changes to the Nitro options, and their projected date of availability.
http://www.arifleet.com/production.html
Dodge Nitro
8-10 weeks
Nitro 4x4 models have a 10-12 week lead time
(RER) AM/FM CD MP3 Navigation Radio has a Job #1 of 1/29/07
Full-time 4WD w/ (EGS) 4.0L V6 engine has a Job #1 of 7/10/07
Portable utility table has a Job #1 of 7/14/07
[/list]
You can monitor this website for future changes to the Nitro options, and their projected date of availability.
http://www.arifleet.com/production.html
Dodge Nitro
8-10 weeks
Nitro 4x4 models have a 10-12 week lead time
(RER) AM/FM CD MP3 Navigation Radio has a Job #1 of 1/29/07
Full-time 4WD w/ (EGS) 4.0L V6 engine has a Job #1 of 7/10/07
Portable utility table has a Job #1 of 7/14/07
[/list]