Dodge Nitro Forum banner

Trailer Hitch and Bezel Install

7357 Views 11 Replies 7 Participants Last post by  DocNitro
13
Install took about 2 1/5 hours from start to finish.

First cut out the hole drilling templet.



Tape the templet in the bezel groove.



Use an automatic center punch to mark the holes to be drilled.



Remove the templete and drill the holes with a 1/8" bit.



Cut slots between the holes with a NEW blade in your box cutter.



Scribe a line with dividers 1/4" in from the Bezel Groove.



Cut the scribed line with a NEW blade in your box cutter.



Insert the Bezel into the slots.



Bezel install is complete...Now go drink a quart of water, rest a while and then install the Hitch.



Jack up the hitch and line up the two most forward holes.



Start the two most forward bolts to hold the hitch in place.



Lift the rear of the hitch in place and Install all the rest of the bolts. Torque to 85 ft lbs.



Clean up your mess, step back and enjoy your completed Trailer Hitch and Bezel Install.

See less See more
  • Like
Reactions: 4
1 - 1 of 12 Posts
Good Stuff, Thanks

Thanks for helping me make up my mind on a towing solution. All things considered that will work the best for me. Good job. The great pics were appreciated along with the source for the parts.
1 - 1 of 12 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top